Key takeaways
- You cannot compare totals until you have compared scope.
- Check quantities, specification and, for used pieces, condition first.
- Then check the work around the furniture: delivery, receiving, installation and removal.
- Speed and clarity matter too: a quote that arrives late cannot help you decide.
You have two or three proposals on your desk and the totals are far apart. The cheaper one may be the better deal. Or it may simply cover less.
The short answer: you cannot compare totals until you have compared scope. First check that each quote lists the same quantities, the same specification and, for used pieces, the same condition. Then check that each covers the same work around the furniture. Only then does the difference in price mean something. The matrix below gives you one page to do it on.
Step one: are they quoting the same furniture?
Read each quote line by line against your own brief.
- Quantities. Count the desks, chairs, tables and storage on each quote. A missing chair or two is an easy way for totals to drift.
- Specification. Same desk size? Fixed height or adjustable? Same chair adjustments? Same finishes? A quote with a simpler chair is not a cheaper version of the same office. It is a different office.
- Condition. If one quote includes used pieces, ask how condition is described, whether parts and keys are complete, and whether you can see photos or the pieces themselves.
- Substitutions. Check whether the supplier may swap an item for "an equivalent", and who decides what is equivalent.
If the furniture differs, ask each supplier to requote on one agreed list. Ask how long the revision will take before setting your decision date.

Step two: are they quoting the same work?
This is where most of the gap usually hides. Fill in one column per supplier. Write "covered", "excluded", "not stated" or the amount shown.
| Item | Quote A | Quote B | Quote C |
|---|---|---|---|
| Quantities match your brief | |||
| Specification and finishes match | |||
| Condition stated for used pieces | |||
| Freight to the area | |||
| Receiving and inspection | |||
| Delivery to the dock only, or into the room | |||
| Assembly | |||
| Installation and placement to the plan | |||
| Packaging removal | |||
| Removal of old furniture | |||
| Storage, if dates slip | |||
| Applicable taxes shown | |||
| Assumptions listed | |||
| Optional items priced separately | |||
| What the lead time covers |
Every "not stated" is a question to send back before you decide.
The lines that cause the most confusion
Dock versus room. "Delivery" can mean a pallet left at the loading dock or furniture placed at each seat. That can change the labor, access arrangements and time required. Ask which one the quote means.
Assembly versus installation. Assembly is putting an item together. Installation is placing everything to the plan, leveling it and leaving the space usable. Some quotes include one and not the other.
Packaging. A furnished office produces a surprising amount of cardboard. Ask who takes it away.
Receiving. If goods arrive before your space is ready, someone has to take delivery and hold them. Ask where, for how long and whether it is in the price.
Old furniture. Ask whether removal is covered, how many pieces it covers and where they go.
Assumptions. Good quotes say what they assume: elevator access, normal building access windows, a clear floor. If your building does not match the assumption, the price will change. A quote with no assumptions listed has still made them.
Options. Monitor arms, screens and upgraded finishes should sit on their own lines. If they are folded into one quote's total and missing from another's, pull them out before comparing.
Lead time. A lead time can mean ready to ship, delivered to a receiver, or installed. Ask each supplier which, and what date the space is usable.
Step three: compare, then ask
Once every row is filled, you will usually see one of three things.
- The quotes cover the same scope. Now the totals are comparable, and you can weigh price against how clearly each supplier answered.
- One quote is missing work. Ask that supplier to price the missing rows before comparing complete totals. If you use an interim allowance to plan your budget, label it unconfirmed budget estimate and keep it separate from the supplier's quoted total.
- The furniture itself differs. Go back to step one and agree a single list.
A supplier who answers these questions plainly is showing you how the project will go. Slow or vague answers before the order rarely get faster after it.
What this cannot tell you
A matrix compares what is written down. It does not tell you how well the furniture is made, whether a used set is as good as described, or whether a crew will show up on the day. For those, ask to see the pieces where you can, and ask how problems after delivery are handled.
If you are still choosing between new and used, see new, used or a mix. If this is your first office, start with the five decisions to make first.
Want a second quote to compare?
Put ours in the same matrix as the others. We list what is covered so you can check it line by line, and we would rather win on speed, clarity and how easy we are to work with than on being the cheapest line on the page.
How Clearspace makes this easier
A second quote is only useful if it arrives while you are still deciding.
Office furniture looks a lot alike from one dealer to the next. Buying it does not have to. We built the Clearspace Design Studio so the whole purchase runs in one place, from the first question all the way to your quote:
- Tell us about the project. A few quick questions: what is changing, what you need, how the desks should be laid out and powered, how many of each and when you need it. Budget is optional.
- Get a shortlist picked for you. Recommended pieces for each category, with the fastest-shipping options flagged when your date is tight. You can browse the full catalog too.
- Build it in your own Design Room. Compare options side by side, turn products around in 3D where we have the model, choose finishes and set quantities. Your scope updates as you go.
- Tell us about delivery and installation once. Address, loading, elevators or stairs, dates and when your building allows work, in a few guided steps, so nobody has to chase you for details later.
- Get your quote the same day. Submit your scope and a person on our team builds the quote from it. It comes back the same day.
- Walk through it with us. We book a meeting to go through the quote with you, adjust anything on the spot, and finalize the order together.
Prefer to talk it through? Send us a floor plan or a list and we can set up a private Design Room for you with options already picked.
For new furniture we focus on Clear Design and also carry lines like JSI. Fast-ship lines arrive in weeks, not months. Select fast-ship lines arrive in weeks, not months, and the order waits only until your install date. Built-to-order lines take longer, and you get the date in writing before you order. When a used set fits, we show you what is available now.
Frequently asked questions
Why are office furniture quotes so different?
Usually because they do not cover the same scope. One may include delivery, installation and removal while another quotes product only, or quotes a different specification.
What should an office furniture quote include?
Quantities, model and finish for each item, condition for used pieces, freight, receiving and storage, installation, removal of old furniture and tax, plus what is excluded.
Should I just pick the cheapest quote?
Only after the scope matches. Once it does, weigh how fast and clearly each dealer answers, and whether you can compare options and see exactly what you are buying.